Which Is The Best Soil For Filling In Building Construction



Sometimes on site, we encounter different situations that really brings us so much confusion and sand filling is such a situation since we might not be able to tell the right type of sand to use for filling. 
This however depends on the nature of the kind of soil that is prevalent in the area.


Talking about the nature of soil in the area, it all boils down to the following 2 questions:

1a. Is my house built on a swampy soil (for clients)

1b. Did I construct this building on a swampy soil (for contractors?

2. Is my house built on a non swampy soil?


Now if you’ve asked and answered the above questions, I’ll be glad to explain things about filling sands.


If you are building on a swampy soil, water logged area, then its best you buy Sharp sand for the filling. 


Why Should I Use Sharp sand For Filling?


Sharp sand has a weak capillarity, when well compacted, the capillarity is so weak, the water won’t be able to rise to the super structure easily.


When Should I Use Laterite/Red Sand for Filling?


I recommend you use Laterite if the entire area is dry and free from flood.

Check ground/earth wells, inquire from Bore hole drillers to be able to know how far the water table is from the surface before you use Laterite for filling.



This is because if you apply Laterite which is quite high in capillarity in an area where the water table is quite close to the surface, during the wet season, you’ll notice some swellings around the building.

These swellings are usually observed just after the DPC. You’ll just notice the paint is almost wearing off even though its just a few months after painting.

This spoils the beauty of your home and also weakens the foundation since swelling would bring moisture to the super structure.

So Which Type Of Soil Do I Need For Filling

Truth is, Laterite can be used, sharp sand can be used too but then again, if you follow road constructions processes closely, you’ll notice that sharp sand is usually used around coastal areas (areas that are prone to flooding or swampy area while Laterite is used on dry areas.

Recommended:  Tutorial: Steps In The Design Of A 2-Way Spanning Slab With BS8110
Laterite Used As sub base Course material (Road Construction) in Nigeria



For instance, in Delta State, Nigeria, we have dry areas like Agbor, Abraka, Some part of Effurun, etc. Now roads on this part of the state are levelled with Laterite but along the riverine areas like Patani, Burutu, Gbaramatu, Bormadi, you see construction workers applying Sharp sand.

Recommended:  What is Earth Work In Civil Engineering
Sharp sand used as sub Base Course material (Road Construction)
In Nigeria



That is not a coincidence. It is because of all that i have explained above.

Well. I’ve discussed on The best type of sand to be used in Filling. Its now left for you to make the right choice.

Don’t forget to build for stability, build for longevity and not for aesthetics alone.


Written by admin

Hi, I'm Okpese! It is my job to handle the content aspect of this great organization and I'm determined to ensure you get it all right as long as you're handling a construction project in Nigeria!

15 Comments

Leave a Reply
  1. Good day sir,
    I’m planning to build around water area
    What should I do
    Because I’ve already started
    With the piles and the beams
    But still see water coming on the ground but place is sand land sir ?

    • If you hired a seasoned Engineer for this project and he’s actively coming to site as the work progresses, then you have nothing to worry about!
      You could help us understand better if you sent us an image of your site too!

Leave a Reply

Your email address will not be published. Required fields are marked *

Cost Estimate For Construction Of Septic Tank In Nigeria

3 bedroom flat in Nigeria

How many Blocks for 3 Bedroom Flat in Nigeria